List of Infrastructure Project List of Infrastructure Project

This Report provides information on infrastructure projects implemented by the Government on PPP basis across pre-defined set of parameters and following coverage criteria:
  • Projects that were either under 'Pre-construction Stage', ‘Under Construction’ or ‘Operation and Maintenance Stage’ as on April 1, 2011 or ‘Awarded’ thereafter and with Project Cost >INR 5 crore.
Information available as on May 15, 2017
Please click on project name for more details of the project.
Search
No. of Projects in this Report: 1582 Total Project Cost(in Rs Crore): 1,158,452.38
Sl No
1 Development of railway over bridge in length of 1.5 km at Palanpur-Radhanpur- Samakhyali 1.50 KM (Kilometer) 109.59 Build-Operate-Transfer (BOT) Annuity Transport Roads and bridges Operation and Maintenance Stage Roads and Buildings Department, Gujarat Patel Infrastructure Private Limited-Ajay Engineering (JV) 23-Aug-2011 180 Gujarat
2 Implementation of 100 TPD solid waste management facility unit at Calangute 100.00 TPD (Tonne per day) 145.95 Design-Build-Finance-Operate-Transfer (DBFOT) Water Sanitation Solid waste management Operation and Maintenance Stage Goa State Infrastructure Development Corporation Limited Hindustan Waste Treatment Private Limited 14-Aug-2014 120 Goa
3 Setting up of 13 MW Nyikong hydel power unit in Upper Siang 13.00 MW (Mega Watt) 94.90 Build-Own-Operate-Transfer (BOOT) Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Aswani Power Projects Private Limited 29-Nov-2010 480 Arunachal Pradesh
4 Setting up of 18 MW Dengzi hydel power unit at Kalaktang 18.00 MW (Mega Watt) 133.20 Build-Own-Operate-Transfer (BOOT) Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Buru Enterprises 24-Nov-2015 480 Arunachal Pradesh
5 Setting up of 15 MW Palin hydel power unit in Kra Daadi 15.00 MW (Mega Watt) 106.50 Build-Own-Operate-Transfer (BOOT) Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Ibuilt Infrastructure 11-Jun-2010 480 Arunachal Pradesh
6 Setting up of 13 MW Pith hydel power unit at Yazali 13.00 MW (Mega Watt) 91.00 Build-Own-Operate-Transfer (BOOT) Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Ibuilt Infrastructure 23-Aug-2013 480 Arunachal Pradesh
7 Setting up of 20 MW Yammeng hydel power unit in Upper Siang 20.00 MW (Mega Watt) 144.00 Build-Own-Operate-Transfer (BOOT) Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Arti Power & Ventures Private Limited 08-Aug-2013 480 Arunachal Pradesh
8 Setting up of 96 MW Pema Selphu hydel power unit in West Siang 96.00 MW (Mega Watt) 672.00 Build-Own-Operate-Transfer (BOOT) Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Greenko Energies Private Limited 27-Dec-2007 480 Arunachal Pradesh
9 Setting up of 80 MW Rapum hydel power unit in West Siang 80.00 MW (Mega Watt) 560.00 Build-Own-Operate-Transfer (BOOT) Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Greenko Energies Private Limited 27-Dec-2007 480 Arunachal Pradesh
10 Setting up of 24 MW Sichi hydel power unit 24.00 MW (Mega Watt) 175.20 Build-Own-Operate-Transfer (BOOT) Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh SLS Power Limited 30-Apr-2012 480 Arunachal Pradesh
11 Setting up of 24 MW Panyi hydel power unit 24.00 MW (Mega Watt) 168.00 Build-Own-Operate-Transfer (BOOT) Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh Sowbhagya Energy Private Limited 27-Aug-2010 480 Arunachal Pradesh
12 Setting up of 18 MW Pacha hydel power unit in East Kameng 18.00 MW (Mega Watt) 126.00 Build-Own-Operate-Transfer (BOOT) Energy Renewable energy (grid) Pre-construction Stage Department of Hydro Power Development, Arunachal Pradesh SMJ Energy Private Limited 02-Mar-2009 480 Arunachal Pradesh
13 Construction of bus terminal on 7.3 acres of land at Palanpur 7.30 Acres 75.80 Design-Build-Finance-Operate-Transfer (DBFOT) Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation M. V. Omni Projects (India) Limited 21-Mar-2017 378 Gujarat
14 Construction of bus terminal on 7.7 acres of land in Patan 7.70 Acres 52.50 Design-Build-Finance-Operate-Transfer (DBFOT) Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Katira Construction Limited 21-Mar-2017 378 Gujarat
15 Construction of bus terminal on 7.4 acres of land at Modasa 7.40 Acres 60.47 Design-Build-Finance-Operate-Transfer (DBFOT) Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Nila Infrastructures Limited-Vyapti Infrabuild Private Limited (JV) 21-Mar-2017 378 Gujarat
16 Construction of bus terminal on 7.3 acres of land in Navsari 7.30 Acres 64.64 Design-Build-Finance-Operate-Transfer (DBFOT) Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation D.R. Agarwal Infraventures Private Limited 21-Mar-2017 378 Gujarat
17 Construction of bus terminal on 5.3 acres of land in Bharuch 5.30 Acres 74.49 Design-Build-Finance-Operate-Transfer (DBFOT) Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation D.R. Agarwal Infraventures Private Limited 21-Mar-2017 378 Gujarat
18 Construction of bus terminal on 5 acres of land at Nadiad 5.00 Acres 50.71 Design-Build-Finance-Operate-Transfer (DBFOT) Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Katira Construction Limited 21-Mar-2017 378 Gujarat
19 Construction of bus terminal on 17.3 acres of land in Junagadh 17.30 Acres 165.56 Design-Build-Finance-Operate-Transfer (DBFOT) Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation D.R. Agarwal Infraventures Private Limited 21-Mar-2017 378 Gujarat
20 Construction of bus terminal on 3.1 acres of land in Bhuj 3.10 Acres 28.85 Design-Build-Finance-Operate-Transfer (DBFOT) Transport Urban public transport (except rolling stock) Pre-construction Stage Gujarat State Road Transport Corporation Katira Construction Limited-CCEL(JV) 21-Mar-2017 378 Gujarat
Note: Zero indicates information not available.

These reports are based on data received from relevant Project Authorities and is being updated on a best endeavor basis.